Skip to product information
1 of 12

PayPal, credit cards. Download editable-PDF & invoice in 1 second!

YD/T 1730-2008 English PDF (YDT1730-2008)

YD/T 1730-2008 English PDF (YDT1730-2008)

Regular price $305.00 USD
Regular price Sale price $305.00 USD
Sale Sold out
Shipping calculated at checkout.
Quotation: In 1-minute, 24-hr self-service. Click here YD/T 1730-2008 to get it for Purchase Approval, Bank TT...

YD/T 1730-2008: Implementation Guide for Security Risk Assessment of Telecom Network and Internet

This standard specifies the elements of risk assessment for telecom network and internet security, the relationship between the elements, the implementation process, the form of work, the principles to be followed, the different requirements and implementation points at different stages of the life cycle of telecom network and internet. This standard applies to the risk assessment work of the telecom networks and the internet.
YD/T 1730-2008
COMMUNICATION INDUSTRY STANDARD
OF THEPEOPLE REPUBLIC OF CHINA
Implementation guide for security risk assessment of
telecom network and internet
ISSUED ON. JANUARY 14, 2008
IMPLEMENTED ON. JANUARY 14, 2008
Issued by. Ministry of Information Industry of PRC
Table of Contents
Foreword... 3
1 Scope... 6
2 Normative references... 6
3 Terms and definitions... 7
4 Risk assessment framework and process... 10
4.1 Relationship of risk factors... 10
4.2 Implementation process... 12
4.3 Form of work... 12
4.4 Principles to follow... 13
5 Implementation of risk assessment... 14
5.1 Preparation for risk assessment... 14
5.2 Asset identification... 16
5.3 Threat identification... 19
5.4 Vulnerability identification... 21
5.5 Relationship of threat exploitability vulnerabilities... 24
5.6 Confirmation of existing security measures... 25
5.7 Risk analysis... 25
5.8 Risk assessment documents... 28
6 Different requirements for risk assessment in the life cycle of system of telecom network and internet... 30
6.1 Overview of the life cycle of system of telecom network and internet... 30 6.2 Risk assessment of startup stage... 31
6.3 Risk assessment of design stage... 32
6.4 Risk assessment of implementation stage... 33
6.5 Risk assessment of operation and maintenance stage... 34
6.6 Risk assessment of discarding stage... 35
Appendix A (Normative) Calculation method of asset value... 36
Appendix B (Normative) Calculation method of risk value... 38
References... 40
Implementation guide for security risk assessment of
telecom network and internet
1 Scope
This standard specifies the elements of risk assessment for telecom network and internet security, the relationship between the elements, the implementation process, the form of work, the principles to be followed, the different requirements and implementation points at different stages of the life cycle of telecom network and internet. This standard applies to the risk assessment work of the telecom networks and the internet.
This standard can be used as an overall guidance document for the security risk assessment of telecom network and internet. For the security risk assessment of specific networks, please refer to the security protection requirements and security protection testing requirements of specific networks.
2 Normative references
The provisions in following documents become the provisions of this Standard through reference in this Standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard; however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies.
GB/T 5271.8-2001 Information technology - Vocabulary - Part 8.Security
GB/T 9361-2000 Security requirements for computer field
GB/T 19716-2005 Information technology - Code of practice for information security management
YD/T 754-95 General rules for electrostatic protection of communication rooms YD/T 5026-2005 Installation and design standard for cabling duct in the room of telecommunication
YD 5002-94 Design standard for fire protection of posts & communications building YD 5098-2005 Specifications of engineering design for lightning protection and 4.4.5 Confidentiality principle
The assessor shall sign relevant non-disclosure agreements and non-invasive agreements with the assessed network and service operators, so as to protect the interests of the assessed party.
5 Implementation of risk assessment
5.1 Preparation for risk assessment
The preparation of the risk assessment is the guarantee of the effectiveness of the whole risk assessment process. Implementing a risk assessment is a strategic consideration; the results will be affected by the organization's business strategy, business processes, security requirements, system size, structure, etc. Therefore, before the implementation of a risk assessment, the following preparations shall be made.
a) Obtain support and cooperation;
b) Determine the objectives of the risk assessment;
c) Determine the content of the risk assessment;
d) Form a risk assessment team;
e) Conduct research on the assessed subject;
f) Determine the assessment basis and method.
5.1.1 Get support and cooperation
The self-assessment shall be approved by the managing-personnel who are responsible for the relevant work of the organization. The tasks of the relevant management and technical personnel in the risk assessment work shall be clarified. For the inspection assessment, the network and service operators under assessment have the responsibility and obligation to support and cooperate, so as to ensure the smooth progress of the inspection assessment.
5.1.2 Determine objectives
The preparation stage of risk assessment shall clarify the objectives of risk assessment, and provide guidance for the process of risk assessment.
The goal of risk assessment for system of telecom network and internet is to identify the technical and management vulnerabilities, threats faced, possible risks of system of telecom network and internet; be clear with the objective risks; propose and implement appropriate security protection measures in a targeted manner; thereby reducing the occurrence of security events; meeting the security requirements of the sustainable development of the organization's business; maintaining and improving the organization's competitive advantage, profitability and corporate image; meeting the requirements of the country and industry for system of telecom network and internet. 5.1.3 Determine the content
Determining the risk assessment content, based on the risk assessment objective, is the premise of completing the risk assessment. The content of the security risk assessment of the system of telecom network and internet can be all the assets and management institutions in the entire system of telecom network and internet, OR it can be the independent assets and related departments of a certain part of the system of telecom network and internet. The content of risk assessment includes management security risks and technical security risks. The risk assessment content of management security includes security management organization, security management system, personnel security management, system building management, system operation and maintenance management, etc. The risk assessment content of technical security includes business/application security, network security, equipment security, physical environment security, etc.
5.1.4 Form a team
Appropriate risk assessment management and implementation teams shall be formed to support the advancement of the entire risk assessment process. The risk assessment team for self-assessment can be formed by the relevant business key-personnel, technical personnel and management personnel of the development, maintenance and management of the network and service operators. The risk assessment team for inspection assessment may consist of a competent authority and assessment agency. The assessment team shall be able to ensure that the risk assessment work is carried out effectively.
5.1.5 Research the assessed object
The risk assessment team shall conduct sufficient research on the assessment objects, in the system of telecom network and internet. The research content shall include the network structure and network environment; the main hardware and software and the data and information contained therein; the personnel of management, maintenance and use. Focus on researching the asset value, existing vulnerabilities and threats of the assessed object, so as to lay the foundation for the selection of the basis and method of risk assessment AND the implementation of the assessment.
The survey of assessed objects can be carried out by a combination of questionnaire survey and on-site interview. Questionnaire is a question form, that provides a set of management or operation control questions for technical or management personnel to fill in; on-site interview is for assessors to observe and collect information, on the physical environment and operation of the assessed party.
certain conditions and circumstances, which is the most difficult part of vulnerability identification. Incorrect, ineffective, or not properly implemented security measures can be a vulnerability in themselves.
The methods used in vulnerability identification mainly include questionnaire survey, tool detection, manual verification, document review, penetration testing, etc. It shall be noted that, when identifying the asset vulnerabilities of has-been-running system of telecom network and internet, it is necessary to avoid affecting the normal operation of the system of telecom network and internet, as much as possible; it shall be completed in the experimental environment of equal conditions, as much as possible. Vulnerability identification takes assets as the core; identifies the vulnerabilities that may be exploited by threats for each asset; evaluates the severity of the vulnerabilities. It can also be identified from the physical environment, equipment and systems, network, business/application, etc.; then combined with assets and threats. The data for vulnerability identification shall come from the owners and users of assets, experts in the business field of the system of telecom network and internet, as well as professionals in software and hardware, etc.
Vulnerability identification is mainly carried out from two aspects. technology and management. Technical vulnerability involves security issues at the physical environment layer, equipment and system layer, network layer, business/application layer. Management vulnerability can be divided into technical management vulnerability and organization management vulnerability. The former is related to specific technical activities, whilst the latter is related to the management environment. For different identification objects, the specific requirements for vulnerability identification shall be implemented, with reference to the corresponding technical or management standards. For example, the vulnerability identification of the physical environment can be implemented, with reference to the technical indicators in such standards as GB/T 9361-2000, YD/T 5026-2005, YD 5098-2005, YD 5002-94, YD/T 754-95; the vulnerability identification of the equipment and network can refer to the technical indicators in the standards, such as YDN 126-2005 and YDN 127-2005; the identification of management vulnerability can refer to the requirements in the standards, such as GB/T 19716-2005, ISO/IEC 17799-2005, ISO/IEC 13335.1-2004, to carry out inspections of security management systems and their implementation, and identify management loopholes and deficiencies.
Table 9 provides a reference for the content of vulnerability identification. taken. If the risk result is within the acceptable range, the risk is acceptable and the existing risk shall be maintained. If the risk result is out of acceptable range, it is an unacceptable risk; then it is necessary to formulate a risk treatment plan and take new security measures to reduce and control the risk.
It shall comprehensively consider the risk control cost and the impact of the risk; combine the security level of the network or system, where the asset is located, to propose an acceptable risk threshold.
5.7.3 Risk treatment plan
For unacceptable risks, a risk treatment plan shall be developed based on the vulnerabilities and threats that lead to the risk. The risk treatment plan specifies the new security measures to compensate the vulnerability; reduces the loss as caused by the security event; or reduces the occurring possibility of security event, the expected effects, the implementation conditions, the schedule, the responsible departments, etc. The selection of security measures shall fully take into account the possible constraints of organization, capital, environment, personnel, time, law, technology, social culture, considering both management and technology; the management measures can be used as a supplement to technical measures. The selection and implementation of security measures shall refer to relevant national and industry standards.
After selecting new security measures for unacceptable risks, in order to ensure the effectiveness of security measures, re-assessment shall be carried out to determine whether the residual risk, after the implementation of new security measures that has been reduced to an acceptable level. The assessment of residual risk can be carried out according to the risk assessment process of this standard; it can also be appropriately reduced.
For some risks, after the selection of new security measures, the risk assessment result of residual risk is still within the unacceptable range. In this case, it shall be considered whether to accept this risk OR further increase the corresponding security measures. 5.8 Risk assessment documents
5.8.1 Requirements for risk assessment documents
During the risk analysis process of the system of telecom network and internet, it shall record the risk assessment process; keep it as an assessment document. It shall meet (but not be limited to) the following requirements.
a) Ensure that documents are approved prior to publication;
b) Ensure that changes to the document and the current revision status are identifiable;
c) Ensure that the distribution of the documentation is properly controlled AND that the relevant version of the applicable documentation is available at the time of use;
d) Prevent the unintended use of obsolete documents; if obsolete documents need to be retained for any purpose, they shall be properly identified.
Controls required for identification, storage, protection, retrieval, shelf life, disposal shall also be specified, in relevant documents which are formed during the risk assessment process.
5.8.2 Risk assessment documents
Risk assessment documents include assessment process documents and assessment result documents, which are generated in the entire risk assessment process. Risk assessment documents include (but are not limited to) the following items. a) Risk assessment plan. Describe the objectives, scope, personnel, assessment methods, form of assessment results, implementation progress of risk assessment; b) Risk assessment procedure. Clarify the purpose, responsibilities, process, relevant document requirements of risk assessment, as well as various assets, threats, vulnerability identification, judgment basis, which are required for the implementation of this assessment;
c) Asset identification list. Identify assets, according to the asset classification method, which is determined by the organization in the risk assessment procedure document; form an asset identification list; specify the person/department responsible for the asset;
d) List of important assets. According to the results of asset identification and assignment, form a list of important assets, including the name, description, type, importance, responsible person/department, etc. of the important asset; e) Threat list. According to the results of threat identification and assignment, form a threat list, including threat name, type, source, motivation, frequency of occurrence;
f) Vulnerability list. According to the results of vulnerability identification and assignment, form a vulnerability list, including the name, description, type, severity of specific vulnerabilities;
g) Confirmation table of existing security measures. According to the confirmation results of security measures that have been taken, form a confirmation table of existing security measures, including the name, type, function description, implementation effect of existing security measures;
6.3 Risk assessment of design stage
The risk assessment, in the design stage, needs to put forward the security function requirements, in the construction plan, according to the operating environment and the importance of the assets which are specified in the start-up stage; judge the compliance of the security function, as the basis for the risk control of the procurement process. The assessment object, at this stage, is the construction plan. It shall assess, in a detailed manner, the description of the threat, the list of assets such as specific equipment and software that will be used, the security function requirements of these assets. The assessment at this stage includes the following.
a) Whether the physical and natural environment, internal and external intrusion and other threats which are faced after the construction of the system of telecom network and internet, have been analyzed; whether the overall security strategy for the construction of the system of telecom network and internet has been formulated;
b) Whether certain measures have been taken to deal with possible failures of the system of telecom network and internet; whether risks that may arise from access to other networks have been considered;
c) Whether the development method is selected, according to the development scale, time and network characteristics; whether the software, hardware and network involved are analyzed and selected, according to the design and development plan and user needs;
d) Assess the vulnerabilities of the technical implementation, in the design or prototype, as well as personnel and organizational management, including the management vulnerabilities in the design process and the inherent vulnerabilities of the technology platform;
e) The impact of the security control measures and security technical assurance means, which are used in the design activities, on the risk results; this assessment needs to be repeated, after the security requirements and design changes. The risk assessment in the design stage shall determine the compliance of the security functions, which are provided by the construction plan, with the security protection requirements of the system of telecom network and internet. The assessment results shall ultimately be reflected in the design report or construction implementation plan of the system of telecom network and internet.
6.4 Risk assessment of implementation stage
The purpose of the risk assessment, in the implementation stage, is to identify risks in the development and implementation process of the system of telecom network and internet, according to the security requirements and operating environment of the system of telecom network and internet; meanwhile, conduct security testing and quality control during the implementation and acceptance of the system of telecom network and internet, based on the threats analyzed in the design stage and the established security control measures.
The assessment object at this stage is the realization degree of security measures, so as to determine whether security measures can resist the influence of existing threats and vulnerabilities.
The risk assessment in the implementation stage includes assessment at two stages. the development stage and the implementation delivery stage.
The specific assessment content, in the development stage, includes.
a) Assess the impact of relevant standards for risk assessment in the communications industry, on security requirements;
b) Assess whether security requirements effectively support the functions of system of telecom netw...