GB/T 42494-2023 English PDF (GBT42494-2023)
GB/T 42494-2023 English PDF (GBT42494-2023)
Regular price
$170.00 USD
Regular price
Sale price
$170.00 USD
Unit price
/
per
Delivery: 3 seconds. Download true-PDF + Invoice.
Get QUOTATION in 1-minute: Click GB/T 42494-2023
Historical versions: GB/T 42494-2023
Preview True-PDF (Reload/Scroll if blank)
GB/T 42494-2023: Functional configurations and basic requirements for international road freight hub
GB/T 42494-2023
GB
NATIONAL STANDARD OF THE
PEOPLE'S REPUBLIC OF CHINA
ICS 03.220.20
CCS R 12
Functional configurations and basic requirements for
international road freight hub
ISSUED ON: MARCH 17, 2023
IMPLEMENTED ON: JULY 1, 2023
Issued by: State Administration for Market Regulation;
Standardization Administration of PRC.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 5
4 Service functions ... 5
5 Facility configuration ... 7
6 Device configuration ... 12
7 Operation services ... 13
References ... 15
Functional configurations and basic requirements for
international road freight hub
1 Scope
This document stipulates the service function, facility configuration, equipment
configuration, and operational service requirements for international road freight hubs.
This document applies to the construction, operation and management of international
road freight hubs.
This document does not apply to the construction, operation and management of
international road freight hubs that carry out dangerous goods road transport business.
2 Normative references
The following documents contain the provisions which, through normative reference in
this document, constitute the essential provisions of this document. For the dated
referenced documents, only the versions with the indicated dates are applicable to this
document; for the undated referenced documents, only the latest version (including all
the amendments) is applicable to this document.
GB 5768.2 Road traffic signs and markings - Part 2: Road traffic signs
GB 5768.3 Road traffic signs and markings - Part 3: Road traffic markings
GB/T 12419 Classification, equipment and installation of highway inland container
depot
GB/T 13145 Specification and management requirements of the stacking yard for
refrigerated containers
GB 13495.1 Fire safety signs - Part 1: Signs
GB/T 15566.1 Public information guidance system - Setting principles and
requirements - Part 1: General principles
GB 15630 Requirements for the placement of fire safety signs
GB 17945 Fire emergency lighting and evacuate indicating system
GB/T 20501.6 Public information guidance systems - Design principles and
4.1.2 It shall have the function of drop and pull transport operation service.
4.1.3 Service functions such as empty and heavy container storage, unpacking and
packing shall be provided.
4.1.4 Inbound and outbound vehicle transportation management services for inbound
and outbound cargoes shall be provided, including but not limited to the handling and
inspection of international road transport licenses and vehicle nationality identification
marks, and inspection of cargo transportation documents.
4.2 Customs clearance service function
The customs clearance service functions of international road freight hubs shall meet
relevant national port management regulations.
4.3 Information service function
4.3.1 It shall have the functions of vehicle weighing and entry and exit statistics, and
should have vehicle information management functions such as license plate
recognition and automatic measurement of vehicle outer dimensions.
4.3.2 It shall have the cargo information management functions for entering, exiting,
and storing of goods.
4.3.3 It shall have personnel information management functions for vehicle driver
qualifications, identity, and other information.
4.3.4 It shall have enterprise information management functions for logistics,
transportation, commerce, and other settled enterprises.
4.3.5 It shall have station information management functions such as leasing
management, parking management, and property management.
4.3.6 It shall be able to receive relevant instruction information according to the
supervision needs of the management department, and realize the transmission and
exchange of electronic data such as the entry, exit and storage status of goods and
transportation vehicles as required.
4.3.7 It is appropriate to provide convenient customs declaration and inspection
information services for international road cargo transportation enterprises engaged in
inbound and outbound business.
4.3.8 It should have information management functions such as a visual command
center and a public information release platform.
4.3.9 It should have service functions for exchanging information between multiple
modes of transportation.
5.1.9 The area of each facility shall comply with the relevant requirements of JT/T 402.
5.1.10 The lighting design of outdoor workplaces shall comply with the requirements
of GB 50582.
5.1.11 The configuration of entry-exit vehicle transportation management facilities for
inbound and outbound goods shall comply with the relevant requirements of JT/T 1412.
5.2 Freight service facilities
5.2.1 Site facilities
5.2.1.1 Cargo storage yard
The cargo storage yard shall meet the following requirements:
a) The type of ground material shall be determined through technical and
economic comparison according to the nature of the cargo, load, local
hydrogeology, and other conditions;
b) Drainage shall be connected with the overall drainage system of the
international road freight hub;
c) It shall be located in the same functional area as the warehouse (shed) facilities.
5.2.1.2 Container yard
The container yard shall meet the following requirements:
a) It shall comply with the relevant provisions of GB/T 12419;
b) The foreign trade container yard operation area shall be isolated from other
operation areas;
c) A yard that supports refrigerated container storage shall be provided and
comply with the relevant regulations of GB/T 13145.
5.2.1.3 Parking lot
The parking lot shall meet the following requirements:
a) The sizes of Chinese and foreign vehicles shall be taken into account for the
parking space setting;
b) External vehicles and self-use vehicles within the station shall be parked in
separate areas;
c) For an international road freight hub with the function of drop and pull
transport operation, the parking lots may be divided into heavy-trailer parking
lots and empty-trailer parking lots as needed;
d) It is advisable to set up a backup parking area for large transport vehicles,
giving priority to providing convenience for parking of large transport vehicles.
5.2.1.4 Loading and unloading (operation) yard
The loading and unloading (operation) yard shall meet the following requirements:
a) Loading and unloading (operation) yards are set up on one or both sides of
various warehouses and cargo yards, and are connected to main roads;
b) A drop-and-pull transport operation site shall be set up near the drop-and-pull
transport parking area, connected to the main road, and provide services for
international road drop-and-pull transport connections.
5.2.1.5 Road facilities
Road facilities shall meet the following requirements:
a) The width of the main road shall be no less than 15 m, preferably 15 m~30 m;
the width of the secondary road shall be no less than 9 m, preferably 9 m~15
m.
b) The passage of pedestrians shall be separated from that of vehicles, and road
signs and markings shall be set up in accordance with the provisions of GB
5768.2 and GB 5768.3.
c) It is advisable to separate the exits and entrances so that vehicles can travel in
one direction; if vehicles enter and exit at the same entrance, a separation zone
shall...
Get QUOTATION in 1-minute: Click GB/T 42494-2023
Historical versions: GB/T 42494-2023
Preview True-PDF (Reload/Scroll if blank)
GB/T 42494-2023: Functional configurations and basic requirements for international road freight hub
GB/T 42494-2023
GB
NATIONAL STANDARD OF THE
PEOPLE'S REPUBLIC OF CHINA
ICS 03.220.20
CCS R 12
Functional configurations and basic requirements for
international road freight hub
ISSUED ON: MARCH 17, 2023
IMPLEMENTED ON: JULY 1, 2023
Issued by: State Administration for Market Regulation;
Standardization Administration of PRC.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 5
4 Service functions ... 5
5 Facility configuration ... 7
6 Device configuration ... 12
7 Operation services ... 13
References ... 15
Functional configurations and basic requirements for
international road freight hub
1 Scope
This document stipulates the service function, facility configuration, equipment
configuration, and operational service requirements for international road freight hubs.
This document applies to the construction, operation and management of international
road freight hubs.
This document does not apply to the construction, operation and management of
international road freight hubs that carry out dangerous goods road transport business.
2 Normative references
The following documents contain the provisions which, through normative reference in
this document, constitute the essential provisions of this document. For the dated
referenced documents, only the versions with the indicated dates are applicable to this
document; for the undated referenced documents, only the latest version (including all
the amendments) is applicable to this document.
GB 5768.2 Road traffic signs and markings - Part 2: Road traffic signs
GB 5768.3 Road traffic signs and markings - Part 3: Road traffic markings
GB/T 12419 Classification, equipment and installation of highway inland container
depot
GB/T 13145 Specification and management requirements of the stacking yard for
refrigerated containers
GB 13495.1 Fire safety signs - Part 1: Signs
GB/T 15566.1 Public information guidance system - Setting principles and
requirements - Part 1: General principles
GB 15630 Requirements for the placement of fire safety signs
GB 17945 Fire emergency lighting and evacuate indicating system
GB/T 20501.6 Public information guidance systems - Design principles and
4.1.2 It shall have the function of drop and pull transport operation service.
4.1.3 Service functions such as empty and heavy container storage, unpacking and
packing shall be provided.
4.1.4 Inbound and outbound vehicle transportation management services for inbound
and outbound cargoes shall be provided, including but not limited to the handling and
inspection of international road transport licenses and vehicle nationality identification
marks, and inspection of cargo transportation documents.
4.2 Customs clearance service function
The customs clearance service functions of international road freight hubs shall meet
relevant national port management regulations.
4.3 Information service function
4.3.1 It shall have the functions of vehicle weighing and entry and exit statistics, and
should have vehicle information management functions such as license plate
recognition and automatic measurement of vehicle outer dimensions.
4.3.2 It shall have the cargo information management functions for entering, exiting,
and storing of goods.
4.3.3 It shall have personnel information management functions for vehicle driver
qualifications, identity, and other information.
4.3.4 It shall have enterprise information management functions for logistics,
transportation, commerce, and other settled enterprises.
4.3.5 It shall have station information management functions such as leasing
management, parking management, and property management.
4.3.6 It shall be able to receive relevant instruction information according to the
supervision needs of the management department, and realize the transmission and
exchange of electronic data such as the entry, exit and storage status of goods and
transportation vehicles as required.
4.3.7 It is appropriate to provide convenient customs declaration and inspection
information services for international road cargo transportation enterprises engaged in
inbound and outbound business.
4.3.8 It should have information management functions such as a visual command
center and a public information release platform.
4.3.9 It should have service functions for exchanging information between multiple
modes of transportation.
5.1.9 The area of each facility shall comply with the relevant requirements of JT/T 402.
5.1.10 The lighting design of outdoor workplaces shall comply with the requirements
of GB 50582.
5.1.11 The configuration of entry-exit vehicle transportation management facilities for
inbound and outbound goods shall comply with the relevant requirements of JT/T 1412.
5.2 Freight service facilities
5.2.1 Site facilities
5.2.1.1 Cargo storage yard
The cargo storage yard shall meet the following requirements:
a) The type of ground material shall be determined through technical and
economic comparison according to the nature of the cargo, load, local
hydrogeology, and other conditions;
b) Drainage shall be connected with the overall drainage system of the
international road freight hub;
c) It shall be located in the same functional area as the warehouse (shed) facilities.
5.2.1.2 Container yard
The container yard shall meet the following requirements:
a) It shall comply with the relevant provisions of GB/T 12419;
b) The foreign trade container yard operation area shall be isolated from other
operation areas;
c) A yard that supports refrigerated container storage shall be provided and
comply with the relevant regulations of GB/T 13145.
5.2.1.3 Parking lot
The parking lot shall meet the following requirements:
a) The sizes of Chinese and foreign vehicles shall be taken into account for the
parking space setting;
b) External vehicles and self-use vehicles within the station shall be parked in
separate areas;
c) For an international road freight hub with the function of drop and pull
transport operation, the parking lots may be divided into heavy-trailer parking
lots and empty-trailer parking lots as needed;
d) It is advisable to set up a backup parking area for large transport vehicles,
giving priority to providing convenience for parking of large transport vehicles.
5.2.1.4 Loading and unloading (operation) yard
The loading and unloading (operation) yard shall meet the following requirements:
a) Loading and unloading (operation) yards are set up on one or both sides of
various warehouses and cargo yards, and are connected to main roads;
b) A drop-and-pull transport operation site shall be set up near the drop-and-pull
transport parking area, connected to the main road, and provide services for
international road drop-and-pull transport connections.
5.2.1.5 Road facilities
Road facilities shall meet the following requirements:
a) The width of the main road shall be no less than 15 m, preferably 15 m~30 m;
the width of the secondary road shall be no less than 9 m, preferably 9 m~15
m.
b) The passage of pedestrians shall be separated from that of vehicles, and road
signs and markings shall be set up in accordance with the provisions of GB
5768.2 and GB 5768.3.
c) It is advisable to separate the exits and entrances so that vehicles can travel in
one direction; if vehicles enter and exit at the same entrance, a separation zone
shall...