Skip to product information
1 of 4

PayPal, credit cards. Download editable-PDF & invoice In 1 second!

GB/T 28878.9-2019 English PDF (GBT28878.9-2019)

GB/T 28878.9-2019 English PDF (GBT28878.9-2019)

Regular price $90.00 USD
Regular price Sale price $90.00 USD
Sale Sold out
Shipping calculated at checkout.
Delivery: 3 seconds (Download full-editable-PDF + Invoice).
Quotation: Click GB/T 28878.9-2019>>Add to cart>>Quote
Editable-PDF Preview (Reload if blank, scroll for next page)

GB/T 28878.9-2019: Specification of the rotating component in space science experiments -- Part 9: Delivery
This Part of GB/T 28878 specifies the storage conditions and reinspection methods of rotating component in space science experiments under specified conditions, as well as data analysis and evaluation after storage. Among them, if there are special requirements for the environmental conditions of storage and reinspection in the contract or technical requirements, it shall be implemented in accordance with the contract or technical requirements. This Part applies to the storage and reinspection of rotating component in space science experiments at the component level and the complete-machine level. The storage and reinspection of rotating component of other payloads and spacecraft platforms in the corresponding state can refer to it for use.
GB/T 28878.9-2019
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 49.035
V 22
Specification of the rotating component in space
science experiments - Part 9: Delivery
ISSUED ON: JUNE 04, 2019
IMPLEMENTED ON: OCTOBER 01, 2019
Issued by: State Administration for Market Regulation;
Standardization Administration of the People’s Republic of
China.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 4
4 Delivery preparation ... 4
5 Delivery inspection ... 5
6 Product delivery ... 7
Specification of the rotating component in space
science experiments - Part 9: Delivery
1 Scope
This Part of GB/T 28878 specifies the requirements for the delivery preparation, delivery inspection and product delivery of rotating component.
This Part applies to the delivery of rotating component in space science experiments. The delivery of rotating component of other payloads and
spacecraft platforms can refer to it for use.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 14481-2008, Test procedure for single-phase synchronous machines
GB/T 20638-2006, General specification for stepping motors
GB/T 25915.1-2010, Cleanrooms and associated controlled environments.
Part 1: Classification of air cleanliness
GB/T 28878.1, Specification of the rotating component in space science
experiments. Part 1: General requirements of design
GB/T 28878.6-2016, Specification of the rotating component in space
science experiments. Part 6: Property testing
3 Terms and definitions
Terms and definitions determined by GB/T 28878.1 are applicable to this document.
4 Delivery preparation
4.1 Product self-inspection
The delivered product shall be inspected by the contractor in accordance with the following documents:
a) contract (if any);
b) technical requirements (technical agreement or development task book); c) product specifications or acceptance test details.
4.2 Quality control inspection
Before the product is delivered, the manufacturer shall check the product process control and prepare corresponding documents for the user to check. The quality control inspection shall include:
a) quality assurance of raw materials;
b) process quality control, including key parts, important parts, key processes and special process control records;
c) documents and records related to quality assurance of outsourced
products;
d) calibration and verification of test equipment, measurement equipment and measuring instruments;
e) records of quality problems and corrective actions that are taken during production;
f) other quality control conditions that shall be checked.
4.3 Delivery document inspection
The delivery documents shall be inspected before delivery, including:
a) certificates and resumes;
b) test report;
c) reliability test report;
d) instruction manual.
5 Delivery inspection
5.1 Inspection responsibility
View full details