1
/
of
7
www.ChineseStandard.us -- Field Test Asia Pte. Ltd.
GB 31335-2024 English PDF
GB 31335-2024 English PDF
Regular price
$260.00
Regular price
Sale price
$260.00
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
GB 31335-2024: Norm of the energy consumption per unit production of iron ore mining and dressing
Delivery: 9 seconds. Download (and Email) true-PDF + Invoice.Get Quotation: Click GB 31335-2024 (Self-service in 1-minute)
Newer / historical versions: GB 31335-2024
Preview True-PDF
Scope
This document specifies the levels, technical requirements, statistical scope andcalculation methods for the allowance of energy source consumption (hereinafter
referred to as "energy consumption") per unit production of iron ore surface mining,
underground mining and dressing.
This document is applicable to the calculation and assessment of the energy
consumption per unit production of iron ore surface mining, underground mining and
dressing, as well as the energy consumption control of new construction, reconstruction
and expansion projects.
Basic Data
Standard ID | GB 31335-2024 (GB31335-2024) |
Description (Translated English) | Norm of the energy consumption per unit production of iron ore mining and dressing |
Sector / Industry | National Standard |
Classification of Chinese Standard | F01 |
Classification of International Standard | 27.010 |
Word Count Estimation | 14,155 |
Date of Issue | 2024-04-29 |
Date of Implementation | 2025-05-01 |
Older Standard (superseded by this standard) | GB 31335-2014; GB 31336-2014; GB 31337-2014 |
Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
Share






