Skip to product information
1 of 12

www.ChineseStandard.us -- Field Test Asia Pte. Ltd.

DL/T 5056-2007 English PDF (DL/T5056-2007)

DL/T 5056-2007 English PDF (DL/T5056-2007)

Regular price $495.00
Regular price Sale price $495.00
Sale Sold out
Shipping calculated at checkout.

DL/T 5056-2007: Technical Code of General Plan Design for Substation

Delivery: 9 seconds. Download (and Email) true-PDF + Invoice.
Get Quotation: Click DL/T 5056-2007 (Self-service in 1-minute)
Newer / historical versions: DL/T 5056-2007

Preview True-PDF


Scope

This Standard stipulates the basic technical requirements of general plan design for
substations.
This Standard is applicable to the general plan design for newly constructed or
expanded substations with the voltage level of 110 kV ~ 750 kV. The general plan
design for substations with the voltage level of above 750 kV, reconstructed
substations and converter stations may also take this as a reference.

Basic Data

Standard ID DL/T 5056-2007 (DL/T5056-2007)
Description (Translated English) Technical Code of General Plan Design for Substation
Sector / Industry Electricity and Power Industry Standard (Recommended)
Classification of Chinese Standard P62
Classification of International Standard 29.240.10
Word Count Estimation 74,785
Date of Issue 2007-12-03
Date of Implementation 2008-06-01
Older Standard (superseded by this standard) DL/T 5056-1996
Quoted Standard GB 50007; GB 50016; GB 50187; GB 50201; GB 50229; GB 50330; GBJ 22; DL/T 5032
Regulation (derived from) NDRC Notice No. 81 of 2007
Issuing agency(ies) National Development and Reform Commission
Summary This standard specifies the general layout of substation design of the basic technical requirements. This standard applies to the voltage level of 110kV ~ 750kV substation new or expanded general arrangement design. Right above voltage level 750kV substation, substation and alterations converter station layout design can refer to the total use.


View full details