1
/
von
12
PayPal, credit cards. Download editable-PDF and invoice in 1 second!
GB 50339-2013 English PDF (GB50339-2013)
GB 50339-2013 English PDF (GB50339-2013)
Normaler Preis
$405.00 USD
Normaler Preis
Verkaufspreis
$405.00 USD
Grundpreis
/
pro
Versand wird beim Checkout berechnet
Verfügbarkeit für Abholungen konnte nicht geladen werden
Delivery: 3 seconds. Download true-PDF + Invoice.
Get QUOTATION in 1-minute: Click GB 50339-2013
Historical versions: GB 50339-2013
Preview True-PDF (Reload/Scroll if blank)
GB 50339-2013: Cade for acceptance of quality of intelligent building systems
GB 50339-2013
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P GB 50339-2013
Code for Acceptance of Quality of Intelligent Building
Systems
ISSUED ON: JUN 26, 2013
IMPLEMENTED ON: FEBRUARY 1, 2014
Issued by: Ministry of Housing and Urban-Rural Construction of the People’s
Republic of China;
General Administration of Quality Supervision, Inspection and
Quarantine of the People’s Republic of China.
Table of Contents
1 General Provisions ... 7
2 Terminologies and Symbols ... 8
2.1 Terminologies ... 8
2.2 Symbols ... 8
3 Basic Requirements ... 9
3.1 General Requirements ... 9
3.2 Quality Control of Engineering Implementation ... 10
3.3 System Checking and Measuring ... 12
3.4 Acceptance of Subsection (Sub-subsection) Project ... 13
4 Intelligent Integration System ... 16
5 Communication Access System ... 18
6 Telephone Switching System ... 19
7 Information Network System ... 20
7.1 General Requirements ... 20
7.2 Computer Network System Checking and Measuring ... 20
7.3 Network Security System Checking and Measuring ... 22
8 Generic Cabling System ... 24
9 Mobile Communication Indoor Coverage System ... 26
10 Satellite Communication System ... 27
11 Cable Television and Satellite Television Receiving System ... 28
12 Public Address System ... 31
13 Conference System ... 33
14 Guidance and Information Display System ... 36
15 Clock System ... 37
16 Information Technology Application System ... 39
17 Building Equipment Monitoring System ... 41
18 Fire Alarm System ... 44
19 Security and Protection System ... 45
20 Emergency Response System ... 48
21 Machine Room Engineering ... 49
22 Lightning Protection and Earthing ... 51
Appendix A Records of Quality Management and Inspection in Construction Site ... 52
Appendix B Records of Project Implementation and Quality Control ... 53
Appendix C Checking and Measuring Records ... 59
Appendix D Acceptance Record of Subsection (Sub-subsection) Project ... 79
Wording Explanation of This Code ... 82
List of Quoted Standards ... 83
Code for Acceptance of Quality of Intelligent Building
Systems
1 General Provisions
1.0.1 This code is formulated with view to strengthening the quality management of
intelligent building systems, standardizing the quality acceptance of intelligent building
systems, specifying the organization procedures and qualification evaluation criteria of the
quality checking and acceptance of intelligent building systems and guaranteeing the quality
of intelligent building systems.
1.0.2 This code is applicable to the quality acceptance of intelligent building systems in
constructed, renovated and extended engineering.
1.0.3 The quality acceptance of intelligent building systems shall not only meet those
specified in this code, but also meet those specified in the relevant current standards of the
nation.
2 Terminologies and Symbols
2.1 Terminologies
2.1.1 System checking and measuring
After the installation, debugging, self-checking and trial running of intelligent building
system have been completed, certain methods, instruments and equipment will be adopted to
conduct overall checking and testing on the system functions and performance and to provide
conclusion.
2.1.2 Rectification
Modification and adjustment on the rejected item of the engineering to make it be
qualified.
2.1.3 Trial running
The continuous operation process of system within specified time after the installation,
debugging and self-checking of intelligent building system.
2.1.4 Project supervision
An organization dispatched by supervision organization to be responsible for the
performance of supervision contract of engineering project.
2.1.5 Acceptance group
A temporary institution formed by relevant personnel under the organization of the
development organization and undertaking the acceptance works during engineering
acceptance.
2.2 Symbols
HFC - Hybrid Fibre Coax
ICMP - Internet Control Message Protocol
IP - Internet Protocol
PCM - Pulse Code Modulation
QoS - Quality of Service
VLAN - Virtual local Area Network
inspection record shall meet the following requirements:
l The equipment and material receiving inspection record shall be filled in by the
construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.1 of Appendix B of this code;
2 The equipment unpacking inspection record shall meet the requirements of the
current national standard “Code for Installation of Intelligent Building Systems” (GB 50606).
3.2.5 The concealed engineering (follow-up inspection) acceptance record shall be filled in
by the construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.2 of Appendix B of this code.
3.2.6 The installation quality and appearance quality acceptance record shall be filled in by
the construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.3 of Appendix B of this code.
3.2.7 The self-checking record shall be filled in by the construction organization, the
inspection conclusion shall be made by the professional technical principal of the construction
organization and the record format shall meet those specified in Table B.0.4 of Appendix B of
this code.
3.2.8 The subitem project quality acceptance record shall be filled in by the construction
organization, the inspection conclusion shall be made by the professional technical principal
of construction organization, the acceptance conclusion shall be made by the supervision
engineer of supervision (development) organization (professional technical principal of the
project) and the record format shall meet those specified in Table B.0.5 of Appendix B of this
code.
3.2.9 The trial running record shall be filled in by the construction organization, the
inspection conclusion shall be made by the supervision engineer of supervision (development)
organization (professional engineer of the project), and the record format shall meet those
specified in Table B.0.6 of Appendix B of this code;
3.2.10 The quality control of software product shall not only cover the contents specified in
3.2.4 of this code, but also cover the document data and technical indexes; moreover, it shall
meet the following requirements:
l The use permit and application scope of commercial software shall meet the contract
requirements;
2 As for the application software compiled in allusion to the engineering project, the
function and performance testing results given in the testing report shall meet the contract
requirements for the engineering project.
3.2.11 The quality control of interface shall not only cover the contents specified in 3.2.4 of
this code, but also meet the following requirements:
l The interface technical document shall meet the contract requirements; the interface
technical document shall cover such contents as interface overview, interface block diagram,
interface position, interface type and quant...
Get QUOTATION in 1-minute: Click GB 50339-2013
Historical versions: GB 50339-2013
Preview True-PDF (Reload/Scroll if blank)
GB 50339-2013: Cade for acceptance of quality of intelligent building systems
GB 50339-2013
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P GB 50339-2013
Code for Acceptance of Quality of Intelligent Building
Systems
ISSUED ON: JUN 26, 2013
IMPLEMENTED ON: FEBRUARY 1, 2014
Issued by: Ministry of Housing and Urban-Rural Construction of the People’s
Republic of China;
General Administration of Quality Supervision, Inspection and
Quarantine of the People’s Republic of China.
Table of Contents
1 General Provisions ... 7
2 Terminologies and Symbols ... 8
2.1 Terminologies ... 8
2.2 Symbols ... 8
3 Basic Requirements ... 9
3.1 General Requirements ... 9
3.2 Quality Control of Engineering Implementation ... 10
3.3 System Checking and Measuring ... 12
3.4 Acceptance of Subsection (Sub-subsection) Project ... 13
4 Intelligent Integration System ... 16
5 Communication Access System ... 18
6 Telephone Switching System ... 19
7 Information Network System ... 20
7.1 General Requirements ... 20
7.2 Computer Network System Checking and Measuring ... 20
7.3 Network Security System Checking and Measuring ... 22
8 Generic Cabling System ... 24
9 Mobile Communication Indoor Coverage System ... 26
10 Satellite Communication System ... 27
11 Cable Television and Satellite Television Receiving System ... 28
12 Public Address System ... 31
13 Conference System ... 33
14 Guidance and Information Display System ... 36
15 Clock System ... 37
16 Information Technology Application System ... 39
17 Building Equipment Monitoring System ... 41
18 Fire Alarm System ... 44
19 Security and Protection System ... 45
20 Emergency Response System ... 48
21 Machine Room Engineering ... 49
22 Lightning Protection and Earthing ... 51
Appendix A Records of Quality Management and Inspection in Construction Site ... 52
Appendix B Records of Project Implementation and Quality Control ... 53
Appendix C Checking and Measuring Records ... 59
Appendix D Acceptance Record of Subsection (Sub-subsection) Project ... 79
Wording Explanation of This Code ... 82
List of Quoted Standards ... 83
Code for Acceptance of Quality of Intelligent Building
Systems
1 General Provisions
1.0.1 This code is formulated with view to strengthening the quality management of
intelligent building systems, standardizing the quality acceptance of intelligent building
systems, specifying the organization procedures and qualification evaluation criteria of the
quality checking and acceptance of intelligent building systems and guaranteeing the quality
of intelligent building systems.
1.0.2 This code is applicable to the quality acceptance of intelligent building systems in
constructed, renovated and extended engineering.
1.0.3 The quality acceptance of intelligent building systems shall not only meet those
specified in this code, but also meet those specified in the relevant current standards of the
nation.
2 Terminologies and Symbols
2.1 Terminologies
2.1.1 System checking and measuring
After the installation, debugging, self-checking and trial running of intelligent building
system have been completed, certain methods, instruments and equipment will be adopted to
conduct overall checking and testing on the system functions and performance and to provide
conclusion.
2.1.2 Rectification
Modification and adjustment on the rejected item of the engineering to make it be
qualified.
2.1.3 Trial running
The continuous operation process of system within specified time after the installation,
debugging and self-checking of intelligent building system.
2.1.4 Project supervision
An organization dispatched by supervision organization to be responsible for the
performance of supervision contract of engineering project.
2.1.5 Acceptance group
A temporary institution formed by relevant personnel under the organization of the
development organization and undertaking the acceptance works during engineering
acceptance.
2.2 Symbols
HFC - Hybrid Fibre Coax
ICMP - Internet Control Message Protocol
IP - Internet Protocol
PCM - Pulse Code Modulation
QoS - Quality of Service
VLAN - Virtual local Area Network
inspection record shall meet the following requirements:
l The equipment and material receiving inspection record shall be filled in by the
construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.1 of Appendix B of this code;
2 The equipment unpacking inspection record shall meet the requirements of the
current national standard “Code for Installation of Intelligent Building Systems” (GB 50606).
3.2.5 The concealed engineering (follow-up inspection) acceptance record shall be filled in
by the construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.2 of Appendix B of this code.
3.2.6 The installation quality and appearance quality acceptance record shall be filled in by
the construction organization, the inspection conclusion shall be made by the supervision
engineer of supervision (development) organization (professional engineer of the project), and
the record format shall meet those specified in Table B.0.3 of Appendix B of this code.
3.2.7 The self-checking record shall be filled in by the construction organization, the
inspection conclusion shall be made by the professional technical principal of the construction
organization and the record format shall meet those specified in Table B.0.4 of Appendix B of
this code.
3.2.8 The subitem project quality acceptance record shall be filled in by the construction
organization, the inspection conclusion shall be made by the professional technical principal
of construction organization, the acceptance conclusion shall be made by the supervision
engineer of supervision (development) organization (professional technical principal of the
project) and the record format shall meet those specified in Table B.0.5 of Appendix B of this
code.
3.2.9 The trial running record shall be filled in by the construction organization, the
inspection conclusion shall be made by the supervision engineer of supervision (development)
organization (professional engineer of the project), and the record format shall meet those
specified in Table B.0.6 of Appendix B of this code;
3.2.10 The quality control of software product shall not only cover the contents specified in
3.2.4 of this code, but also cover the document data and technical indexes; moreover, it shall
meet the following requirements:
l The use permit and application scope of commercial software shall meet the contract
requirements;
2 As for the application software compiled in allusion to the engineering project, the
function and performance testing results given in the testing report shall meet the contract
requirements for the engineering project.
3.2.11 The quality control of interface shall not only cover the contents specified in 3.2.4 of
this code, but also meet the following requirements:
l The interface technical document shall meet the contract requirements; the interface
technical document shall cover such contents as interface overview, interface block diagram,
interface position, interface type and quant...